April 17, 2002 |
The School Board publishes MINUTES of its meetings as soon as possible after each meeting. The EXCERPTS from the latest meeting are provided below as an unofficial review of the actions taken. Citizens may arrange to review the official minutes by calling the Department of Information Services at 995-1126.
AGENDA SECTION THE SCHOOL BOARD OF DADE COUNTY, FLORIDA Miami, Florida APPROVED Bid Opening Lists of March 5, 7, 19, 21, 26 and
28, 2002. *
Amended the report, Plan of Action to Staff Key
Administrative Positions, Page 3, Paragraph 1, to read as follows: “To the extent possible, candidates for all
open positions (other than Chief Financial Officer) will be in place no less
than 30 days prior to the departure of the incumbent…” 102,311 A-2 AUTHORIZED The
Superintendent to request an increase of the statutorily-imposed charter school
cap on a case-by-case basis; and received the briefing paper: The Impact of
Public Charter Schools in Miami-Dade County. 102,312 B-1 APPROVED* A
reduction to 2% *
Amended as reflected above. 102,313
DIRECTED The Superintendent to review the practice
of reducing the 5% statutorily permitted administrative fee to 1% in exchange
for compliance with the conditions listed on the Official Agenda, and return to
the Board with a rule pertaining to same. 102,314 B-2 APPROVED The charter
school contractual agreement for Bayard Rustin Charter School for a period of 5
years commencing with the 2003-2004 school year. 102,315 B-3 APPROVED The amendment
to the Amended Charter School Contractual Agreement for Youth Co-Op Charter
School beginning with the 2002-2003 school year, as delineated in the Official
Agenda. 102,316 B-4 APPROVED The amendment
to the Amended Charter School Contractual Agreement for Coral Reef Montessori
Academy Charter School beginning with the 2002-2003 school year, as delineated
in the Official Agenda. 102,317 B-5 APPROVED The
amendments to the contractual agreements for Doral Academy and Doral Academy
High School to provide for enrollment preferences. ****** B-6 See Agenda Item A-2. 102,318 B-7 AUTHORIZED The
Superintendent to enter into cooperative agreements with Redlands
Christian Migrant Association Head
Start, the Head Start Division of the Miami-Dade County Community Action
Agency, and the Head Start Division of the Miccosukee Corporation to serve
preschool children with disabilities, from July 1, 2002 through June 30, 2003;
and renew the cooperative agreements for up to two additional one-year periods. 102,319 B-8 AUTHORIZED The Superintendent to enter into a
cooperative agreement with the Early Intervention Programs, Part C, to provide
services to children ages birth through two,
from July 1, 2002 through June 30, 2003; and renew the cooperative
agreement for up to two additional one-year periods. 102,320 B-9 AUTHORIZED The Superintendent to enter into a
cooperative agreement with the Specialized Adolescent Center of Children’s Home
Society of Florida, to provide educational services to exceptional students in
a residential treatment program, from July 1, 2002 through June 30, 2003; and
renew the cooperative agreement for up to two additional one-year periods. 102,321 B-10 AUTHORIZED The
Superintendent to accept $3,200 from the Dade-Monroe Regional Comprehensive
System of Personnel Development Partnership for substitute funds for a maximum
of 20 teachers to attend the Linking Forces XI Conference, May 16-17, 2002. 102,322 B-11 AUTHORIZED The Superintendent to enter into
cooperative agreements with the Children’s Rehab Network and Jackson Infant
Toddler Center to provide services to children with disabilities in Prescribed
Pediatric Extended Care facilities, from July 1, 2002 through June 30, 2003; and renew
the cooperative agreements for up to two additional one-year periods. 102,323 B-12 AUTHORIZED The Superintendent to participate
in Project REALM (Really Exploring and Learning Meteorology), and to accept a
donation of weather station equipment and professional development from Florida
State University (FSU), from May 1, 2002 through December 31, 2004. 102,324 B-20 AUTHORIZED A
contractual agreement with the Whirlpool Corporation to establish a Customer
Service Cooperative Training Program at Robert Morgan Educational Center,
effective April 18, 2002 through April 18, 2003. 102,325 B-21 AUTHORIZED The
initiation of rulemaking proceedings to amend School Board Rule 6Gx13-6C-1.02,
Adult/Vocational Education School Calendar - 2001-2002, to reflect an amended
beginning/ending third trimester start date for the current school year. 102,326 B-30 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-212
(2001/2002). 102,327 B-31 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-213
(2001/2002). 102,328 B-32 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-214
(2001/2002). 102,329 B-33 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-215
(2001/2002). 102,330 B-34 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-216
(2001/2002). 102,331 B-35 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-220
(2001/2002). 102,332
B-36 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-222
(2001/2002). 102,333 B-37 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-230
(2001/2002). 102,334 B-38 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-232
(2001/2002). 102,335 B-39 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-233
(2001/2002). 102,336 B-40 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-234
(2001/2002). 102,337 B-41 AUTHORIZED The
expulsion of the student specified in the supplemental material SM-241
(2001/2002). 102,338 B-65 AUTHORIZED The
acceptance of a donation from the Oracle Help Us Help Foundation to implement
the Oracle Promise Program at Sunset Park Elementary School, Project
Cycle: April 18, 2002 through June 30,
2002. 102,339 B-66 AUTHORIZED The
Superintendent to accept a grant award from the Pew Charitable Trusts for
funding the High School Civic Engagement Initiative. 102,340 B-67 AUTHORIZED The
Superintendent to accept a grant award from the Washington County School
District to provide alternate assessment materials and training to exceptional
student education teachers. 102,341
B-68 AUTHORIZED The
Superintendent to accept a grant award from the Florida Department of Education
for funding under the Public Charter Schools Federal Grant Program and enter
into a contractual agreement with Liberty City Charter School. 102,342 B-69 AUTHORIZED The Superintendent to accept a
grant award from the National Council of Jewish Women to expand the “Bully
Proofing Your School” project. 102,343 B-70 AUTHORIZED The
Superintendent to implement the Title I Program Model at Six Pilot Schools. 102,344
B-71 AUTHORIZED The
Superintendent to use Title I funds to provide prekindergarten programs in
Title I eligible schools. 102,345 B-75 APPROVED The
out-of-country field trip to St. Petersburg, Russia for students at New World
School of the Arts, from May 25, 2002 through June 2, 2002. 102,346 C-1 ENTERED Its final order in
the case of The School Board of Miami-Dade County, Florida v. Avery G. Nairn,
DOAH Case No. 01-2483, adopting the Administrative Law Judge’s Recommended
Order affirming the suspension without pay and dismissal of Avery G. Nairn. 102,347 C-2 AUTHORIZED The Superintendent to accept and execute the
Settlement Agreement in the case of Association for Disabled Americans, Inc.,
et al. v. The School Board of Miami-Dade County, Florida, United States
District Court Case No. 00-00249-CIV-LENARD/TURNOFF. 102,348 C-3 APPROVED The Settlement Agreement and acceptance of the
payment of $4,497,809.20, in the case of
Roma Construction, Inc. and Fireman’s Insurance Company of Newark,
New Jersey v. The School Board of Miami-Dade County, Florida, Circuit Court
of the 11th Judicial Circuit in and for Miami-Dade County, Florida,
Case No. 97-05265 CA 27. 102,349 C-4 AUTHORIZED The execution of an
employment agreement with Hector James Montalvo as Assistant Board Attorney for
the period April 18, 2002 through June 30, 2002, at an annual salary of
$90,000. 102,350 C-20 ADOPTED New School Board Rule
6Gx13-8C-1.011, Role and Authority of the School Board as
Licensee/Trustee of WLRN-TV and WLRN-FM, and the document, Editorial
Integrity Policy and Advisory Mechanisms for WLRN Public Television and
Radio. 102,351 C-21 AUTHORIZED The Superintendent to
initiate rulemaking proceedings in accordance with the Administrative Procedure
Act to amend School Board Rule 6Gx13-8C-1.23, School Board Committee
Structure. 102,352 C-22 ADOPTED Amended School Board Rule 6Gx13-8C-1.16,
Minutes-Board Meetings. 102,353 C-23 ADOPTED The following amended
School Board rules: ·
6Gx13-6A-1.02, Elementary and Secondary School Calendar,
2002-2003, 102,354 C-24 ADOPTED Amended School Board
Rule 6Gx13-2C-1.083, Educational Facilities Planning, Site Selection and
Acquisition, and Construction. 102,355 D-1 DISCUSSED New
Business: Board Members 102,356
D-2 APPROVED Resolution
No. 02-16 supporting the recognition of May 2002 and every subsequent May as
Asian Pacific American Heritage Month, and authorizing administrative actions
to foster related activities in all Miami-Dade County Public Schools. 102,357 D-3 APPROVED Resolution
No. 02-17 supporting the recognition of May 2002 and every subsequent May as
Haitian American Heritage/Culture Month, and authorizing administrative actions
to foster related activities in all Miami-Dade County Public Schools. 102,358 D-4 DIRECTED* The
Superintendent to review the current procurement bidding procedures for both
requests for proposals and competitive bids, including the procurement and
acquisition of all employee benefits and employee benefit programs, and to
provide a status report to the Board in July, and a full report in six
months * Amended as reflected above. 102,359 D-5 DIRECTED The
Superintendent to develop a feasibility study process for the inclusion of an
Official School Board Historian to accurately archive School Board records. 102,360 D-6 APPROVED Resolution
No. 02-18 recognizing Kristi House for its outstanding social service work to
help ensure the health and well-being of the children of Miami-Dade County. 102,361 D-7 DIRECTED The
Superintendent to change the grade configuration of Coral Way Elementary School
from grades K-5 to a K-8 Center upon completion of the construction of the
Middle Learning Center. ****** D-8 WITHDREW The
request for approval of Resolution No. 02-19 recognizing the exemplary efforts
of the faculty and staff of Miami Springs Senior High during the 2001-2002
school year. 102,362 D-9 DIRECTED The
Efficiency and Competition Committee to develop an employee awards program to
solicit, review and implement employee proposals for improvements in cost-efficiency
as well as competitive bid projects. 102,363 D-10 AUTHORIZED The
support of the activities of the Florida Coalition Against Domestic Violence (FCADV) as appropriate and authorized any recognized student organizations to
affiliate with FCADV for the purpose of raising awareness of domestic violence
and promoting a statewide victims hotline. ****** D-11 WITHDREW WLRN-TV/WLRN-FM
program selection process. 102,364 D-12 APPROVED Resolution No.
02-20 honoring Ms. Simine Heise, Principal, Maya Angelou Elementary School, for
being awarded the “Chevalier dans l’Ordre de Palmes académiques” diploma by the
French Ministry of Education. 102,365 D-13 APPROVED Resolution No. 02-21 recognizing the partnership
between Miami-Dade County Public Schools and the Foundation for Democracy in
Africa. 102,366
E-1 AUTHORIZED The
Termination of Access Easement which currently encumbers a portion of the
Sunset Elementary School site and authorized the execution of said document. 102,367 E-2 AUTHORIZED The
execution of a Grant of Easement Agreement with Florida Power & Light
Company at the North Beach Elementary School site. 102,368 E-3 AUTHORIZED The
Superintendent to further explore a possible collaborative effort with the City
of Miami’s CRA for the redevelopment and joint use of the Board-owned property
at 29 NW 13th Street; and report back to the Board with findings and
recommendations for the Board’s consideration and final action. 102,369 E-4 AUTHORIZED The
execution of the Temporary Construction Easement Agreement between the School
Board and Miami-Dade County by the School Board Chair and the Superintendent of
Schools for the temporary use of a portion of the parking lot at West Miami
Middle School. 102,370 E-5 AUTHORIZED The
execution of an Annual Permit Agreement with Miami-Dade County for the use of
the A.D. Barnes Park Leisure Access Center and Tropical Park Community Center;
and authorized the execution of a Temporary Access Agreement with Miami-Dade County
to allow the County to use a portion of the Cutler Ridge Elementary School
playfield for temporary construction access. 102,371 E-25 AUTHORIZED The
execution of an agreement with Miami-Dade County and the execution of relevant
conveyance documents for the provision of wastewater services for planned
improvements at the Bunche Park Elementary and the North Dade Middle School
sites, Project No. KV-0583, at an approximate cost of $468,119, which is
included in the CM At Risk construction contract. 102,372 E-26 AWARDED Project No.
AK9999-01, Liberty City Elementary School and Project No. AK9999-02, D.A.
Dorsey Educational Center, Fire Alarm System Replacements to Simplex Grinnell,
LP. 102,373 E-27 AUTHORIZED Staff
to adjust the capital budget by transferring $1,500,000 from Program No. 0001 -
Undistributed Capital Contingency to Program 2627 - Hialeah Senior Project;
authorized staff to make the changes to the five year facilities work program
resulting from this budget adjustment; and awarded Project No. A-0697,
Remodeling of Auditorium, Hialeah Senior High School, to Mexal Corporation. 102,374 E-28 AWARDED Project No.
A-0750C, Media Center Additions/Renovations and Project No. A-0529, Classroom
Addition and Renovations, Mae Walters Elementary School to BDI Construction Co. 102,375 E-29 CONFIRMED Change
Order No. 3 on Project No. 0051-BB, Design-Build, Mays Middle School for an
additional cost of $23,998. 102,376
E-30 CONFIRMED Change
Order No. 5 on Project No. A-0428, Addition, Remodeling and Renovation, Lake
Stevens Middle School for additional cost of $36,052 and approved a time
extension of 30 days. 102,377 E-31 CONFIRMED Final
Change Order No. 8 on Project No. A-0522, Additions, Remodeling, and Renovations,
Nathan B. Young Elementary School for a credit of $144,283. 102,378 E-32 CONFIRMED Final
Change Order No. 3 on Project No. A-0599, Renovation Of Second Floor, Miami
Sunset Senior High School for an additional cost of $15,289. 102,379
E-33 CONFIRMED Change
Order No. 2 on Project No. A-0691, Design-Build Media Center, Mays Middle
School for an additional cost of $11,719. ****** E-34 WITHDREW Request
for approval of Change Order No. 2 on Project No. A-0714, Design-Build for
Addition at S/S "SS" at the Allapattah Middle site for a time
extension of 139 days. 102,380 E-35 APPROVED The use of the
school within a school concept and directed staff to develop new facilities
lists for Board approval based on the proposed new school sizes. 102,381 E-36 ADOPTED The revised
Five-Year Facilities Work Program in accordance with provisions of s.235.185
Florida Statutes. ****** E-37 WITHDREW Request
for approval of the GMP for Pirtle Construction Company, Project No. A-0825-CM,
Relocatable Classrooms, Option No. 3, Site-Build the Units with Conventional
Construction of 35 classroom units in the amount of $3,500,000 which includes a
contingency in the amount of $150,000. 102,382 E-38 AUTHORIZED The
adjustment of the capital budget, as delineated in the Official Agenda. 102,383 E-39 APPROVED The revisions
to the Project Priority List (PPL) for specific projects; approved Amendment
No. 2 to Resolution No. 95-28 and Amendment No. 2 to Resolution No. 96-24
authorizing the use of Education Funds for capital outlay projects described in
section 1(b). 102,384
E-40 AUTHORIZED An
amendment of the contractual agreement with E-Builder to utilize the
TeamBuilder® Internet application and supporting Application Service Provider
(ASP) services in an amount not to exceed $25,599 for an 18 month period. 102,385 E-41
AUTHORIZED Staff to proceed with the removal of
the existing facility [Ada Merritt Elementary] as recommended by the architect,
engineer and construction manager; and amended the existing contracts as
required to construct a replacement facility. 102,386 E-60 CONFIRMED Change
Order No. 1 on Project No. KV0021, Roof Replacement, Redland Middle School for
an additional cost of $71,339 and approved a time extension of 55 days. 102,387 E-70 AUTHORIZED A contractual agreement with the
City of Miami for the Department of Food and Nutrition to provide meals for
participants in the City’s summer program from June 17, 2002 through August 23,
2002. 102,388 E-71 AUTHORIZED The
Superintendent to submit an application to the Florida Department of Education
to sponsor the Summer Food Service Program for Children 2002. 102,389 F-1 APPROVED The list of contractors for prequalification and
authorized staff to issue a certificate to each contractor, certifying
prequalification for a period of one year. 102,390 F-2 RECEIVED The Auditor General of the State of
Florida’s Report No. 02-188 - Miami-Dade County District School Board - A
Financial, Operational, and Federal Single Audit Report for the Fiscal Year
Ended June 30, 2001, presented by the Office of Management and Compliance
Audits. 102,391 F-3 RECEIVED The Auditor
General of the State of Florida’s Report No. 02-195 – Operational Audit of
Budget and Staff Allocation Procedures for Miami-Dade County District School
Board, July 1, 2000 through January 31, 2002, presented by the Office of
Management and Compliance Audits. 102,392 F-4 RECEIVED The Internal
Report – Audit of the Internal Funds of Region IV Elementary Schools, March
2002, presented by the Office of Management and Compliance Audits. 102,393 F-5 RECEIVED The Internal
Report – Audit of the Internal Funds of Region IV Secondary Schools, March 2002,
presented by the Office of Management and Compliance Audits. 102,394
F-6 RECEIVED The audit reports of
the community-based organizations presented by the Office of Management and
Compliance Audits. 102,395 F-11 RECEIVED The report Evaluation
of the Comprehensive Reading Plan – Third Interim Report: 2000-01 School Year. 102,396
F-12 AUTHORIZED The suspension and initiation of dismissal proceedings against Ms. Isabel V. Montes
de Oca, Teacher at Shadowlawn Elementary School, pending the outcome of a
hearing, if requested. 102,397
F-13 AUTHORIZED The suspension of Ms. Lillian Santana, School Bus Aide at Southwest Transportation
Center, for 30 calendar days without pay, pending the outcome of a hearing or
grievance/arbitration process, if requested. 102,398
F-14 AUTHORIZED The suspension and initiation of dismissal proceedings against Mr. Derek Moss,
Teacher at Jose De Diego Middle School, pending the outcome of a hearing, if
requested. 102,399 F-15 AUTHORIZED The suspension of Ms. Mary E. Bell, School Bus Driver at Southwest Transportation
Center, for 30 calendar days without pay, pending the outcome of a hearing or
grievance/arbitration process, if requested. 102,400 F-16 AUTHORIZED The suspension and initiation of dismissal proceedings against Mr. Fitzroy D.
Salesman, Teacher at Miami Lakes Educational Center, pending the outcome of a
hearing, if requested. 102,401 F-17 AUTHORIZED The
termination of the employment contract of Miguel A. Delgado, Campbell Drive
Middle School, and Micah D. Harrell, Palmetto Middle School, instructional
employees, effective April 17, 2002, at the close of the workday, pending the
outcome of a hearing, if requested. 102,402
G-16 RECEIVED The Monthly
Financial Report for February 2002. 102,403 G-46 WITHDREW The request for
issuance of RFP #093-BB10, Administrative Services – Section 125 Flexible
Benefits Program and Enrollment. 102,404 G-60 APPROVED The supplemental award on various
term bids, as delineated in the Official Agenda. 102,405 G-61 RECEIVED The report of
purchases made utilizing other government bids. 102,406
G-62 AUTHORIZED The renewal of Bid No. 082-XX09
– Diplomas, with Herff Jones. 102,407 G-63 AWARDED Bid No. 037-BB07 – Single Engine Aircraft, to
Christiansen Aviation, Inc. 102,408 G-64 AWARDED Bid
No. 032-BB03M/WBE – Food Items: Dry Grocery, to various vendors, as delineated
in the Official Agenda. 102,409 G-65 AWARDED Bid No. 075-BB01 – Clocks,
Electric, to various vendors. 102,410 G-66 AUTHORIZED The renewal of Bid No. 095-AA10 – Sheetrock,
with Miron Building Products Company, Inc. 102,411 G-67 AUTHORIZED The renewal of Bid No. 096-AA10 – Maintainer,
Lift Station, with Caesar Chemical Manufacturing, Inc. ****** G-68 WITHDREW Request to award Bid No. 063-BB08M/WBE – Ballasts, to Paramount Electrical
Distributors, Inc. 102,412 G-69 AUTHORIZED The renewal of Bid No. 050-XX04 – Wiring, Telecommunication (Furnish and
Install - Voice and Data), with various vendors. 102,413 G-70 AUTHORIZED The
renewal of Bid No.
047-AA04 – Wireless Data Networks, with various vendors. 102,414 G-71
AUTHORIZED The renewal of Bid No. 072-AA05 – Classroom
Supplies, with various vendors. 102,415 G-72 AUTHORIZED The renewal of Bid No. 110-AA09 – Printing of
Student Case Management Forms, with Best Forms & Label Printing. 102,416 G-73 AUTHORIZED The renewal of Bid No. 066-AA07 – Automotive Power
Steering Components, New and Rebuilt, with G-Car, Inc. 102,417 G-74 AUTHORIZED The renewal of Bid No. 121-AA07 – Vehicle
Towing, with various vendors. 102,418 G-75 AUTHORIZED The renewal of Bid No. 150-ZZ11 – Portable
Radio Communications Equipment and Accessories, Catalog Discount, with
Cooper-General Corporation. 102,419 G-76 AUTHORIZED The renewal of Bid No. 026-AA07 – After-Market
Improvements, Modifications and Upgrades of Base Original Equipment
Manufacturer (OEM) Vehicle Body and Chassis, with various vendors. 102,420 G-77 AUTHORIZED The renewal of Bid
No. 046-AA11 – Full Color Copiers, Digital Duplicators, Digital
Multi-Functional Devices and Document Imaging Systems, Catalog Discount Bid,
with various vendors. 102,421 G-78 AUTHORIZED The renewal of Bid No. 192-AA11 – Full Color Copiers, Digital
Duplicators, Digital Multifunctional Devices and Document Imaging Systems
Catalog Discount, Part II, with various vendors. 102,422 G-79 REJECTED Bid No. 022-BB07 – Sewing
Machines and Cabinets (Rebid) to permit rebidding. 102,423 G-80 AWARDED Bid No. 034-BB07 – Trucks,
Miscellaneous, to World Ford Pembroke Pines. 102,424 G-81 AWARDED Bid
No. 057-BB02—Solid Waste Collection, to various vendors. 102,425 G-82 AWARDED Bid No. 076-BB01 – Furniture:
Outdoor, to Visions Innovated Products, Inc. 102,426 G-83 TERMINATED The award of items 24, 25 and 26 on Quote No. BB4 - Fresh Fruits and
Vegetables, effective March 1, 2002,
through April 31, 2002. ****** G-84 WITHDREW Request to award
Bid No. 017-BB07 - Automotive, Truck and Bus Parts and Accessories and
Specialized Repairs. ****** G-85 WITHDREW The request for partial award of Bid No. 028-BB04 -
Computers: Classroom/ Administrative and Servers. 102,427 G-86 REJECTED Bid No. 070-BB10
- Commercial Leasing of Paved Parking Facility at South Pointe Elementary
School, to permit rebidding using revised specifications. ****** G-87 WITHDREW Request to award Bid No. 098-BB07 - Petroleum Products. 102,428 G-88 APPROVED Payment to Virtual Learning
Systems for the purchase of curriculum materials for a Train the Trainer
Workshop, for the Division of Mathematics and Science Education. 102,429 G-89 AUTHORIZED The utilization of other entity bids for purchases over $100,000. 102,430 H-1 APPROVED The instructional and noninstructional appointments,
reassignments, leaves, and separations as included in Personnel Action Listing
914. 102,431 H-2 APPROVED The recommendations for appointments and lateral
transfers, to be effective April 17, 2002, or as soon thereafter as can be
facilitated. 102,432
H-3 APPROVED Nominations of the
instructional staff members on Appointment List 3. 102,433 H-4 ACCEPTED The resignations from
employment of those Deferred Retirement Option Program (DROP) participants, included
in DROP Listing 8, as of the dates indicated. 102,434
H-5 AUTHORIZED The contractual
employment of Ms. Susana V. Castillo, and Ms. Victoria Guerrero as
Administrative Assistant to individual School Board members. 102,435 H-6 AUTHORIZED A contractual
agreement with the Gallup Organization Education Services Division of the
Gallup Principal Perceiver Process from April 18, 2002, through April 18, 2003,
at a cost not to exceed $21,000. 102,436 H-7 AUTHORIZED The update of the
Miami-Dade County Public Schools Master Plan for Inservice Education 1999-2004
by adding 50 new components, revising 32 components and deleting one component. 102,437 H-8 AUTHORIZED Waiving the
membership of the Interview and Review Committees of School Board Rule 6Gx13-4A-1.16,
Assignment, Transfer, and Appointment-Non-School Site Administrative Positions;
and authorized the membership of the Interview and Review Committee for
selected Managerial Exempt Personnel positions. Public Hearing 102,438 *** DIRECTED The review of the Code of Student Conduct for possible modifications relating to the definition of “fight,” “battery” and students’ right to self defense. Adjournment /gmc Back to The School Board Page Return to M-DCPS Homepage E-Mail comments to: info@sbab.dade.k12.fl.us |